Our Work

Laboratory blackout curtain for Oxford University

Project Details

Project Date

Our Client

Tender

Website

Contact us today

Phone no.

Address

Unit 4A Hillthorpe Farm
Knoll Lane
Little Hoole
Preston
Lancashire
PR4 4TB

A laboratory blackout curtain system was designed, manufactured, and installed for a laboratory at Oxford University, requiring complete light control for laser-based research. The entire project was handled in-house, ensuring a high level of precision and quality. From design to installation, the project was successfully completed within four weeks.

The primary goal was to achieve total light control to create an optimal environment for using a laser. A heavy-duty, light-blocking fabric was selected, offering complete blackout capabilities while also being durable and fire-retardant to meet safety regulations. Following design approval, the blackout curtains were custom-manufactured in-house to exact specifications. The curtain tracks and mounting hardware were also produced to ensure a perfect fit with the laboratory’s existing infrastructure. Each component was carefully tested to confirm its ability to block all external light sources effectively.

Installation was carried out in-house by our experienced team, ensuring the system was securely fitted to achieve complete blackout conditions. The project was completed on schedule, delivering a high-performance blackout solution tailored to the laboratory’s specific requirements. The system provided researchers with the necessary light control for laser experiments, ensuring accuracy and safety. The client was highly satisfied with the quality of the installation, the effectiveness of the blackout system, and the smooth project execution.

Design

We design all products in house to our clients' exact specifications

Design

Lorem ipsum dolor sit amet, consectetur adipiscing augue pharetra.

Manufacture

By controlling the manufacturing process, we ensure that our designs are perfectly produced

Manufacture

By controlling the manufacturing process, we ensure that our designs are perfectly produced

Installation

Our in-house team attends at a convenient time to complete the installation, ensuring a perfect fit every time

Installation

Our in-house team attends at a convenient time to complete the installation, ensuring a perfect fit every time